Action Guide
- Action Guide
- 3DMG Set Up Guide
- How to set up the project data for work
- How to offset the Design surface
- How to create simple design surface in the app (3D data creation)
- How to get and save the coordinate values of the cutting edge
- How to use projection for construction
- How to check the cutting edge accuracy
- How to check the status of GNSS information
- How to check the controller status
- How to switch to Komatsu Ntrip Caster (Base station)
- How to switch to External Radio mode (Fixed base station)
- How to change the bucket data
- How to change the length of the worn out tooth
- How to use Steer Indicator Function
- How to create the geofence data
- How to use the 2D Machine Guidance.
- How to customize the data display on the guidance screen
- How to change the screen split/layout
- How to set up and use the compass function
- How to display a heatmap of the construction history
- How to display the bucket angle to the design surface
- How to extend a design surface
- Recommended settings for the tablet
- How to set up for Payload Meter in a tablet
- How to perform bucket calibration
- How to manage the amount of soil to be hauled and the loading
- How to create the project for 3DMG machine
- How to create and transfer data files for 3DMG machine
- How to set up a restricted area within the jobsite using a geofence (PilotWEB setup)